McCarthy awarded $62 Million Robert A. Young Federal Building seismic renovation project in St. Louis


McCarthy Building Companies, Inc. (www.mccarthy.com) was recently awarded a $62 million, design-build seismic renovation of the Robert A. Young Federal Building in downtown St. Louis by the General Services Administration (GSA). The project includes the seismic retrofit of the historic structure along with seismic bracing of non-structural components such as ceilings, partitions and mechanical, electrical, plumbing and fire protection systems. The renovation will enhance safety for tenants during and after a potential seismic event. St. Louis is approximately 166 miles north of the New Madrid fault located in southeastern Missouri. 

The Robert A. Young Federal Building is a 1,050,000-square-foot, L-shaped building with a 10-story tower completed in 1933 for the Terminal Railroad Association. Located at the corner of Spruce Street and South Tucker Boulevard, the office building is owned and managed by the U.S. General Services Administration and houses dozens of offices for various federal agencies, such as the Internal Revenue Service, State Department, U.S. Army Corps of Engineers, U.S. Citizenship and Immigration Services, as well as support services such as a cafeteria, daycare, fitness center and credit unions. The facility is 98% occupied. 

“The Robert A. Young Federal Building Seismic Renovation is an important and challenging project,” explained Kevin Williams, senior vice president of McCarthy. “The team is focused on delivering a safer building to the tenants and GSA while minimizing the disruption to existing occupants throughout construction. McCarthy brings extensive seismic retrofit and construction experience in high seismic zones, including Missouri and the West Coast.

Design begins this month and construction is anticipated to begin in mid-2016. McCarthy’s design-build team includes Gensler and Thornton Tomasetti as well as St. Louis firms Etegra, William Tao & Associates, Aschinger Electric, Air Masters, Gateway Mechanical Fire Protection, and Geotechnology, Inc.

 



January 12, 2016


Topic Area: Press Release


Recent Posts

Two Steps to Controlling the Hot Zone

Strategy for disrupting dry-surface biofilm begins with a simple premise: You cannot disinfect what you cannot reach.


RiverSpring Living Breaks Ground on River's Edge Senior Living Community

Occupancy is expected in December 2028.


Encompass Health Reveals Plans to Build Inpatient Rehabilitation Hospital in Post Falls, Idaho

The hospital is expected to open in 2028 and will be part of Encompass Health's national network of inpatient rehabilitation hospitals.


Creating Compassionate Spaces in Healthcare

A new bereavement room at the Children’s Hospital of Michigan NICU aims to provide peace and privacy for families.


Study Shows Connection Between Odor and Patient Experience

A 2024 study identifies the top smells in hospital waiting rooms and how they impact the patient and visitor experience.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.