Metalwërks’ AmeriplateSpline Installed on National Army Museum Facade


The National Museum of the Army will showcase well over 240 years of army history, men and women presently in service, and will look to the Army’s future when it opens its doors in June 2020. Metalwërks products feature heavily at the façade, with 110,000 square feet of Ameriplate™ Spline covering most of the museum’s exterior.

"To date, this is the largest stainless steel wall cladding project performed with this new Metalwërks product,” says Stephen Scharr, Director of Business Development, Metalwërks. “The scale of this project is fitting for its status. We are incredibly proud to be a part of such a culturally significant building.”

Located in proximity to Washington D.C., the building is a massive structure at 185,000 square feet, and it is owned by the U.S. Army with fundraising delegated to a private non-profit group, The Army Historical Foundation (AHF). 

The three-story building was designed by Skidmore, Owings & Merrill (SOM), and the museum is formed of five “pavilions” which are connected by glass thresholds, according to the firm. Metal fins at the corners of each pavilion are incorporated over more glass to add texture and a dynamic sense of movement to the façade.

The conventional building exterior rainscreen wall system is installed over structural metal studs, and exterior grade gyp sheathing covered with a weather resistant air barrier.

Ameriplate Spline panels were assembled using 36” wide, 11-gauge T316 Stainless Steel finished with a #6 long grain, polished face plates attached to an engineered, extruded aluminum frame. The vertically-oriented wall panels feature a laser-cut edge for a crisp, sleek floating appearance, and they also incorporate a recessed spline reveal finished in non-directional satin stainless steel. Many of the panels are 20 feet tall.

With Ameriplate, the cut edges of the faceplate material are the panels’ edges, a capability in metal you can only achieve with plate. When Ameriplate attachment hardware is concealed from view, architects achieve a fascinating floating panel effect, much like the crisp, clean lines at the National Museum of the Army building.

Here, panels are attached to the building using stainless steel furring and mineral wool for the thermal layer. The panel system and thermal layer was installed by Tecta America East LLC - Architectural Metals Division, based in Glen Rock, PA.

The building exterior was completed in 2019. Skidmore, Owings & Merrill was the architect, Clark Construction of Bethesda MD was the general contractor, and Tecta America installed the system.

To learn more about Metalwërks’ Ameriplate and view 3D, high-definition renderings, visit: https://metalwerksusa.com/product/ameriplate/ 



October 17, 2019


Topic Area: Press Release


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.