Mini VRF system from Johnson Controls combines high efficiency with remarkable flexibility


The new YORK® Mini variable refrigerant flow (VRF) cooling and heating system from Johnson Controls, the most energy-efficient mini VRF system today, provides personalized comfort to residential or light commercial buildings with virtually any floorplan.

With its small footprint, it offers a VRF option for buildings with zero lot lines or zoning restrictions, and its light weight and its flexible piping possibilities enable it to be installed on the ground, on a terrace/balcony or on a roof. The modular system enables each unique solution to be built room by room and floor by floor.

These new 3-, 4- and 5-ton heat pumps will accommodate up to eight of the VRF indoor units from Johnson Controls’ current offering as well as the vertical (four-way convertible) Johnson Controls air handler.

Other new VRF products being rolled out in March include:

2-way cassette: Compact and quiet. An optional motion sensor kit saves energy and optimizes occupancy comfort.

Dedicated outside air system (DOAS): Integrated into the VRF piping and controls, the DOAS provides a zoned and decentralized approach to conditioning and supplying outside air.

EconoFresh economizer: An indoor medium static unit and an economizer in one unit, the EconoFresh economizer provides free cooling and air quality when outdoor temperatures are lower than indoor.

Ducted 6- and 8-ton VRF indoor units: Provide design flexibility with a capacity range up to eight tons.

For more information about Johnson Controls’ YORK® VRF product line, visit johnsoncontrols.com/vrf.

 



March 23, 2016


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.