Modine geothermal/water-sourced heat pumps achieve AHRI certification


AHRI certification of HVACR equipment is a demonstration of objective, trusted third-party performance.  Certified products undergo rigorous, independent annual evaluation to ensure that they perform according to the manufacturers’ published claims – allowing end-users to compare products objectively. 

Modine’s geothermal and water-sourced heat pump systems now also offer an enhanced control platform.  The robust controller has served the manufacturer’s school systems and commercial ventilation product lines for more than a decade. All of the systems – from 1.5 tons to 12 tons – now feature the proven Modine Control System, providing quick start-up, easy safety device wiring, multiple inputs and outputs, BACnet IP/Eth, BACnet MSTP and Lon capability and easy troubleshooting. 

The ENERGY STAR-rated residential and light commercial geothermal product line includes water-to-water, water-to-air, and split unit/air-handling systems; all use R410A refrigerant.

Standard features include ECM fan motors, scroll compressors (dual speed on most units), MERV 13 air filters, oversized heat exchangers and a 10-year limited warranty.

• Water-to-water residential and light commercial models are available in reversible and non-reversible sizes from 3- to 12-ton sizes. 

• Water-to-air models range in size from 1.5- to 6-ton units in both vertical and horizontal configurations. 

• Split system/air-handling systems, from 2- to 6-tons, are well-suited for new and retrofit applications. 

Modine offers a number of options including a desuperheater to provide supplemental domestic hot water; cupronickel heat exchangers for applications where harsh water conditions exist; tin-plated coils to eliminate formicary corrosion; and electric heating for auxiliary back-up heat.  

 



January 21, 2016


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.