Modine's enhanced geothermal heat pumps


Modine’s geothermal systems now offer an enhanced control platform.  The robust controller has served the manufacturer’s school systems and commercial ventilation product lines for more than a decade. 

All Modine geothermal systems – from 1.5 tons to 12 tons – now feature the proven Modine Control System, providing quick start-up, easy safety device wiring, multiple inputs and outputs, BACnet IP/Eth, BACnet MSTP and Lon capability and easy troubleshooting. 

The ENERGY STAR-rated residential and light commercial geothermal product line includes water-to-water, water-to-air, water-to-air/water combination, and split condensing/air-handling systems; all use R410A refrigerant.

Standard features include ECM fan motors, dual speed scroll compressors, MERV 13 air filters, oversized heat exchangers and a 10-year limited warranty.

• Water-to-water residential and light commercial models are available in reversible and non-reversible sizes from 2- to 12-ton sizes. 

• Water-to-air models range in size from 1.5- to 6-ton units in both vertical and horizontal configurations. Compact commercial systems are also available for water source or geothermal applications.  

• Water-to-air/water combination units provide forced air heating and cooling and also the ability to provide heat for radiant-heated floors, domestic hot water, pools/spas and snow melting. They are available in 3- to 6-tons in both vertical and horizontal configuration. 

• Split system/air-handling systems, from 2- to 6-tons, are well-suited for new and retrofit applications. 

Modine offers a number of options including a desuperheater which provides supplemental domestic hot water; cupronickel heat exchangers for applications where harsh water conditions exist; tin-plated coils to eliminate formicary corrosion; and electric heating for auxiliary back-up heat.  

 



August 31, 2015


Topic Area: Press Release


Recent Posts

What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Skills Gap Remains Wide in Facilities Management

Many candidates lack the skills that are needed to be a facilities manager.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.