Mule-Hide Products Co. introduces Mule-Hide TPO with CLEAN film


The final step in any well-done TPO job is removing the dirt and scuffs that are inevitably left behind during installation. New Mule-Hide TPO with CLEAN Film from Mule-Hide Products Co. makes this task fast and simple, saving contractors time and money.

The CLEAN Film protects the membrane during installation and then is easily removed, revealing a roof ready for final inspection. No cleaning is required and there is no loss of initial solar reflectivity caused by dirt and scuffs that have accumulated during installation.

Mule-Hide TPO with CLEAN Film can be used in re-cover, re-roof and new construction jobs. It is an ideal solution when a reliable water source is unavailable, or when water conservation or water containment/runoff regulations make cleaning with water impractical.

The durable, rugged film does not shift and will withstand the most intense heat, rain, wind and exposure to ultraviolet radiation without deteriorating. The 5-foot-wide sheets can be easily pulled up by a single crew member, with stress-free, splinter-free removal ensured for 90 days after installation.

“Mule-Hide TPO with CLEAN Film can save contractors significant time and money while helping them deliver a high-quality finished product to their customers,” said Kate Baumann, director of marketing and procurement for Mule-Hide Products Co. “Pressure washing a TPO roof typically costs between $0.15 and $0.75 per square foot, and eliminating this step can save busy crews at least a day of labor.”

The CLEAN Film’s cool gray color also reduces the glare that can make working with white TPO membranes difficult on sunny days. It also enables moisture to evaporate more quickly, enhancing crew safety.

About Mule-Hide Products Co. Inc.

Mule-Hide Products offers premium-quality, high-performance roofing products and systems that meet the current and emerging needs of the design community, contractors and building owners with a strong focus on sustainable solutions. More information is available at www.mulehide.com.

 



May 16, 2016


Topic Area: Press Release


Recent Posts

Preparing Healthcare Facilities for Wildfire Air Quality Events

Wildfire smoke puts pressure on mechanical systems already working hard to maintain controlled indoor environments.


UW Health Set to Open Expansion at East Madison Hospital

The $140 million project adds 120,000 square feet to the hospital, expanding its footprint to roughly 620,000 square feet.


Central Ohio Primary Care Physicians Falls Victim to Cyberattack

While the full extent of the incident is still under review, our initial investigation discovered that there are approximately 1.4 million individuals impacted.


The Role of Biophilic Design in Healthcare Facilities

Nature-inspired design can support staff well-being and create more welcoming, human-centered healthcare environments.


TriStar Centennial Medical Center Invests $90M in Women, Children's Hospital Expansions

The multi-year project will bring significant improvements to both hospitals.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.