Multi-Tankless Water Heater Improves Versatility


The new Commercial Water Heater System from Noritz America is designed to speed and simplify the installation of multiple tankless water heaters for plumbing and mechanical contractors. Noritz combines commercial-grade tankless units with system controllers, manifolds and other necessary components and accessories into fully assembled metal rack systems for shipment anywhere in North America. The prefabricated system significantly reduces the burden on the installer, who needs only to connect the water and gas lines, build the vent runs and set up the pre-wired system controller. 

“Our goal is to reduce installation time and expense while maximizing safety, performance and reliability when building multi-unit tankless systems from scratch — either in the shop or on the job site,” says James Facer, National Accounts Manager - Commercial at Noritz. “With our new prefabricated system, which integrates the only commercial-grade tankless water heaters on the market, we want to bring installation as close to ‘plug-and-play’ as possible for the contractor.” 

Multiple racking options: Thirty-six different rack models are available, all specifically designed for the commercial Energy Star-certified NCC199(GQ-C3257WZ US) Condensing Tankless Water Heater Series. With a thermal efficiency of 94% DV (95% OD), this model offers inputs from 16,000 Btu/hour to 199,900 Btu/h and a maximum flow rate up to 11.1 gallons per minute. 

The NCC199 also features heavy-duty Type K copper and stainless steel heat exchangers, which provide corrosion resistance and are specially engineered to withstand the rigors of commercial applications. 

Rack systems: Intended for installation on flat rooftops or mechanical rooms in commercial buildings, the new racking systems are available in two configurations: 

  • Wall-mount (8 SKUs) can accommodate either two or three Noritz tankless water heaters mounted in-line, using either natural gas or LP as the fuel source. 
  • Floor-mount (28 SKUs) can handle from two to six tankless models, including both in-line and back-to-back positioning; e.g., three in front and three in back. 


Other key features include: 

  • corrosion-resistant aluminum construction to withstand extreme environments, including outdoor rooftop installations; 
  • accurate, customized pre-sizing of gas and water supply lines to save installation time and ensure top performance; 
  • factory installation of remote controller and system controller for monitoring up to six units. 
  • engineered for flexible transport on the job site; systems fit easily through standard-sized commercial doorways.


July 17, 2018


Topic Area: Press Release


Recent Posts

Mattresses Require Strict Care to Prevent Spread of Infections

Poor cleaning and disinfection techniques contribute to the persistent contamination of patient mattresses.


Gardner Health Services Opens Alum Rock Health Center

The 10,080-square-foot facility provides essential medical, dental, mental and chiropractic services to the Mayfair and East San José neighborhoods.


The Children's Center of Hamden Reports Data Security Incident

The incident was detected on December 28, 2024.


Designing for Senior Care Communities Means Designing for Everyone

No spaces can be designed for just one person, designers need to think about everyone who will occupy the space.


Harlem Hospital Legionnaires' Outbreak Highlights Cooling Tower Risks

Seven deaths linked to the cooling towers underscore the need for stricter water system monitoring and preventive maintenance in healthcare settings.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.