NFMT event to include seminar on energy reduction — a Harvard Medical School case study

The 2017 National Facilities Management & Technology event offers three full days of education, speakers, networking with peers, and a giant expo hall. All for free.


This year's National Facilities Management & Technology (NFMT) event will include a seminar on energy reduction — a Harvard Medical School case study.

Energy use reduction has two very distinct benefits:  1). Less demand reduces the production requirement and consequently adverse environmental impacts. 2). Reduced facility energy costs. This session will describe, in depth, the measures taken by Harvard Medical School Facilities Group to attain a 17% reduction in energy use from 2011 through 2016.This case study illustrates the accomplishments in a wet laboratory medical research setting constrained by HVAC requirements. Some examples include air change rate reductions/setbacks, ASHRAE Level II audits, re-commissioning, and continuous commissioning. Proven techniques for success and some of those that failed will be provided in detail.

Learning objectives:
1. Discuss the entire population of measures considered by Harvard Medical School
2. Review the most and least effective measures undertaken
3. Understand the difficulties encountered in implementing changes and some techniques used to overcome challenges
4. Recap lessons learned

The session, scheduled for March 9 at 9:00 a.m. (EST), will be given by Peter Stroup, P.E., Director of Facilities at Harvard Medical School.

The event will be held in Baltimore on March 7-9, 2017.

Check out the NFMT website for more information.

 

 

 

 



February 23, 2017



Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.