National Gypsum introduces XP fire-rated radius wall


National Gypsum announces its newest innovation, Gold Bond BRAND XP Fire-Rated 5/16” Radius Wall, for radius applications requiring fire-rated assemblies. 

XP Fire-Rated 5/16” Radius Wall is used in double-layered construction. A one-hour UL tested assembly can be achieved with two layers, and a two-hour UL tested assembly can be achieved with four layers. 

“More creative design options become available by using XP Fire-Rated Radius Wall instead of traditional 5/8-inch gypsum board,” said Kelly Guinsler, Gypsum Product Manager for National Gypsum. “Designs can include convex and concave walls with a two-foot minimum radius. In addition, this gypsum board provides the best resistance to abrasion and mold in the industry compared to standard gypsum board products.” 

The special PURPLE® XP paper protects against mold, mildew and moisture, and is also abrasion-resistant. Combined with a denser core, XP Fire-Rated Radius Wall provides greater resistance to surface abuse when tested.

XP Fire-Rated 5/16” Radius Wall scores and snaps easily, with no special handling requirements. Tapered edges allow joints to be reinforced with ProForm® BRAND Joint Tape and concealed with ProForm BRAND Ready Mix or ProForm BRAND Quick SetTM Setting Compounds. For optimum resistance against mold and mildew, ProForm BRAND XP® Ready Mix is recommended for use.

For more information, contact your local National Gypsum representative. For technical information, call 1-800-NATIONAL (1-800-628-4662) or visit nationalgypsum.com

 



August 28, 2015


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.