New Axiom Indirect Field Light Coves from Armstrong Ceilings Provide Flexibility in Design and Installation


Armstrong Ceiling Solutions has introduced Axiom® Indirect Field Light Coves, pre-engineered, extruded aluminum coves that integrate with a vertical drywall upturn to provide consistent, predictable lighting performance, and perfect integration with all Armstrong suspension systems.

The adjustable, new drywall leg eliminates the vertical break form leg on standard 
Axiom Indirect Light Coves and allows for field modification if unexpected field conditions arise. For example, if a 12" ceiling-to-ceiling light cove is specified, but field conditions dictate that an 11" ceiling-to-ceiling cove is needed, the drywall vertical leg of the cove can be field modified to adjust for this condition.

The new light coves can also be cut to desired length in the field and are offered with a two-week lead time. Compared to traditional light coves built of drywall, Axiom Field Indirect Light Coves install in one-third the time.

Compatible with Fixtures from Three Lighting Partners 

Aesthetically, the easy-to-specify light coves are available in either ceiling-to-ceiling 
or ceiling-to-wall profiles, and with either 4" Axiom Classic, Axiom Knife Edge® Acoustical, or Axiom Knife Edge Drywall edge details, all with prefabricated corners.

In addition, to ensure a consistent fit and finish, the light coves are designed with a notched channel for perfect integration with compatible, pre-engineered light fixtures from three leading lighting partners — Axis Lighting, Vode® Lighting, and Litecontrol.

For additional information, see Axiom Indirect Field Light Coves.

 



November 7, 2017


Topic Area: Press Release


Recent Posts

Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


Insight Hospital and Medical Center Falls to Data Breach

The investigation determined that an unauthorized individual accessed the network between August 22, 2025, and September 11, 2025.


The High Cost of Healthcare Violence

As workplace violence increases, healthcare facilities face mounting financial and operational disruptions- prompting legislative action.


EVS Teams Can Improve Patient Experience in Emergency Departments

A report confirmed that cleanliness of the ED was the third most impactful element on patient experience surveys.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.