New Axiom Indirect Field Light Coves from Armstrong Ceilings Provide Flexibility in Design and Installation


Armstrong Ceiling Solutions has introduced Axiom® Indirect Field Light Coves, pre-engineered, extruded aluminum coves that integrate with a vertical drywall upturn to provide consistent, predictable lighting performance, and perfect integration with all Armstrong suspension systems.

The adjustable, new drywall leg eliminates the vertical break form leg on standard 
Axiom Indirect Light Coves and allows for field modification if unexpected field conditions arise. For example, if a 12" ceiling-to-ceiling light cove is specified, but field conditions dictate that an 11" ceiling-to-ceiling cove is needed, the drywall vertical leg of the cove can be field modified to adjust for this condition.

The new light coves can also be cut to desired length in the field and are offered with a two-week lead time. Compared to traditional light coves built of drywall, Axiom Field Indirect Light Coves install in one-third the time.

Compatible with Fixtures from Three Lighting Partners 

Aesthetically, the easy-to-specify light coves are available in either ceiling-to-ceiling 
or ceiling-to-wall profiles, and with either 4" Axiom Classic, Axiom Knife Edge® Acoustical, or Axiom Knife Edge Drywall edge details, all with prefabricated corners.

In addition, to ensure a consistent fit and finish, the light coves are designed with a notched channel for perfect integration with compatible, pre-engineered light fixtures from three leading lighting partners — Axis Lighting, Vode® Lighting, and Litecontrol.

For additional information, see Axiom Indirect Field Light Coves.

 



November 7, 2017


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.