Modern HVAC systems present both new challenges and new opportunities when integrating with electrical systems, according to an article on the Consulting Specifying Engineer website.
Mechanical systems have evolved not only technologically, but also in how they're purchased.
Tight project schedules are driving contractors to purchase large mechanical equipment components well in advance of the design completion.
Engineers should be familiar with the technical differences in the modern HVAC systems, and how to account for packaged mechanical equipment, the article said.
Extreme Weather: The Maintenance-Resilience Link
Encompass Health Lower Providence Opens in Pennsylvania
Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion
Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella
Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction