New Optima Concealed ceiling panels from Armstrong create a monolithic visual with a fully concealed suspension system


New Optima Concealed ceiling panels from Armstrong offer a monolithic visual in large format panels that fully conceal the suspension system. The fine textured ceiling panels combine the smooth look of drywall with downward accessibility for projects with minimal plenum heights.

With both an Articulation Class (AC) of 190 and a Noise Reduction Coefficient (NRC) of 0.90, Optima Concealed ceiling panels provide outstanding acoustical performance in open plan areas.

Large Format Panels

Optima Concealed ceiling panels are available in standard 48” x 48”, 30” x 30”, 24” x 48”, 24” x 72”, and 24” x 96” panel sizes. The fiberglass panels install easily on a new or existing Prelude® 15/16” XL® suspension system. The panels have an energy-efficient, high light-reflective white finish. They have a smooth, clean, durable surface that is washable, scratch-resistant, and soil-resistant. The panels have a 30-year guarantee against visible sag, mold, and mildew. The panels are made with up to 71 percent recycled content. They can be ordered along with matching Blizzard White fixture trim kits for a clean, finished look around lights and diffusers.

Optima Concealed ceiling panels are recommended for use in open plan office areas, auditoriums, areas with limited plenum depth, and/or indirect lighting systems.

For more information about Optima Concealed ceiling panels, visit www.armstrong.com/optima.



January 21, 2016


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by power outages.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.