New TempMaster OmniElite single package rooftop units deliver comfort with reduced cost


Johnson Controls has extended its TempMaster line to include OmniElite™ single package rooftop units. Available in 50- to 65-ton cooling capacities, the new units offer a footprint up to 20 percent smaller than competing units, double-wall construction, single-point power connection and efficiency ratings that exceed ASHRAE 90.1 standards.

Double-wall construction, which includes the roof, floor, doors and walls, helps prevent insulation fibers from entering the conditioned air and facilitates periodic cleaning of the unit to prevent harmful buildup of bacteria or contaminants. Double-sloped drain pans also protect against corrosion and bacterial growth for improved air quality.

The new TempMaster units feature multi-step capacity control, high-efficiency scroll compressors and fully modulating gas heat to cut costs while improving comfort. The systems also include:

Advanced ventilation control to avoid waste of conditioning excess outside air and monitor unit functions for maximized efficiency

Airside economizer for compressor-free cooling when outdoor air is cool and dry

Variable-speed drives that slash fan-energy costs as much as 40 percent compared to inlet-guide vanes on some competitive units

Simple, intuitive controls that are standard and are factory-installed to ensure hassle-free operation

Single-point power connection that reduces field wiring costs

Optimized for HFC-410A refrigerant, the TMAL rooftop units also allow easy access to components.

For more information about TempMaster products, visit www.tempmasterhvac.com.

 

 



June 20, 2016


Topic Area: Press Release


Recent Posts

Women in Construction Sees Growth on Florida Jobsite

More than 60 women are part of the workforce building a new Orlando Health Hospital.


Managing Soft Surfaces, Clean or Soiled

Soft surfaces present a cross-contamination risk, even if they’re arriving from the laundry. Here are some best practices to handle both soiled and clean linens.


Ascension St. Vincent's Expands with New Freestanding Emergency Room

The ER facility will be operated by Ascension St. Vincent’s Southside.


Balancing Act: Designing for Safety and Flexibility

By understanding NFPA 99 requirements, facilities can be better designed to meet current needs and anticipate future challenges.


Methodist Healthcare Breaks Ground on Methodist ER Medina Valley

Construction began in March 2026 and is projected for completion by March 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.