New VRF central controllers from Johnson Controls offer more options


A new central controller and enhanced network adapter software from Johnson Controls make it easier than ever to manage variable refrigerant flow (VRF) systems, whether within a building management system or independently.

Users can now easily integrate their VRF systems with a BACnet® or LonWorks® system with enhanced adapters, or can use a remote-access, web-based dedicated system.

The new BACnet adapter software, which can control up to 64 refrigerant systems and 160 indoor units, provides:

Web-based interface for configuration

Streamlined installation and setup from a familiar web browser

Support for Fahrenheit (°F) and Celsius (°C) units

1°F (0.5°C) increments for temperature control

Simplified commissioning of indoor units with an auto-discovery function

The new LonWorks adapter provides similar functionality for the LonWorks open protocol.

The new Web-enabled central controller’s Web-based interface allows a VRF system to be controlled and monitored by up to five local or remote Windows-based PCs and/or tablets. Other features include:

• Built-in software for easy access with no need for an optical drive for installation

• Advanced multi-zone control of large commercial projects

• Block and group control for scheduling, mode, setpoint and prohibit-RC functions

For more information, visit www.johnsoncontrols.com/vrf.



March 31, 2016


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.