New data center ceiling system from Armstrong provides maximum load carrying capacity


LANCASTER, PA — The new Data Center Ceiling System from Armstrong® meets data center needs for improved air flow management, maximum load carrying capacity, and adaptability.

The new Prelude® XL Max™ 15/16” suspension system supports single point loads up to 200 pounds for cable trays, bus bars, and other data center components anywhere along the suspension system face. Using 3/8” threaded rod connections and integrated hanging clips, Prelude XL Max provides flexible and reconfigurable support for overhead cable tray and electrical distribution without a separate strut channel system.

Eliminates Unsightly Threaded Rod Penetrations through the Ceiling Plane 

The patented load connector clips attach to the face of the suspension system, eliminating unsightly threaded rod penetrations through the ceiling plane. This minimizes unwanted air infiltration and improves access and aesthetics. Easily installed anywhere along the suspension system face, the load connector clips provide the flexibility to place cable trays anywhere within a space and reconfigure them to adapt to changes in floor plans or server configurations.

The pre-engineered suspension system meets ASTM C635, ASTM C636, ASTM E580, ICC-ES AC156 and is available in Seismic D, E, and F configurations. The system comes with a 30-Year Limited System Warranty. White is the standard color for main beams and cross tees and all clips are unfinished. Custom colors are available.

Selected Square Lay-In Ceiling Panels 

Armstrong Ceiling Systems offers selected square lay-in ceiling panels that meet the high-performance standards of data center applications and install easily in the new Prelude XL Max suspension system, including Ultima®, Ultima Create!™, and Clean Room™ FL and VL acoustical ceiling panels.

For more information on Data Center Ceiling Systems, visit armstrong.com/datacenterceilings, chat live, or call a U.S.-based TechLine expert at 1-877-276-7876, press 1.

Armstrong World Industries, Inc. is a global leader in the design and manufacture of ceilings and floors. In 2013, Armstrong consolidated net sales from continuing operations totaled approximately $2.7 billion. Based in Lancaster, PA., Armstrong operates 35 plants in eight countries and has approximately 8,600 employees worldwide.

 



November 25, 2014


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.