New data center ceiling system from Armstrong provides maximum load carrying capacity


LANCASTER, PA — The new Data Center Ceiling System from Armstrong® meets data center needs for improved air flow management, maximum load carrying capacity, and adaptability.

The new Prelude® XL Max™ 15/16” suspension system supports single point loads up to 200 pounds for cable trays, bus bars, and other data center components anywhere along the suspension system face. Using 3/8” threaded rod connections and integrated hanging clips, Prelude XL Max provides flexible and reconfigurable support for overhead cable tray and electrical distribution without a separate strut channel system.

Eliminates Unsightly Threaded Rod Penetrations through the Ceiling Plane 

The patented load connector clips attach to the face of the suspension system, eliminating unsightly threaded rod penetrations through the ceiling plane. This minimizes unwanted air infiltration and improves access and aesthetics. Easily installed anywhere along the suspension system face, the load connector clips provide the flexibility to place cable trays anywhere within a space and reconfigure them to adapt to changes in floor plans or server configurations.

The pre-engineered suspension system meets ASTM C635, ASTM C636, ASTM E580, ICC-ES AC156 and is available in Seismic D, E, and F configurations. The system comes with a 30-Year Limited System Warranty. White is the standard color for main beams and cross tees and all clips are unfinished. Custom colors are available.

Selected Square Lay-In Ceiling Panels 

Armstrong Ceiling Systems offers selected square lay-in ceiling panels that meet the high-performance standards of data center applications and install easily in the new Prelude XL Max suspension system, including Ultima®, Ultima Create!™, and Clean Room™ FL and VL acoustical ceiling panels.

For more information on Data Center Ceiling Systems, visit armstrong.com/datacenterceilings, chat live, or call a U.S.-based TechLine expert at 1-877-276-7876, press 1.

Armstrong World Industries, Inc. is a global leader in the design and manufacture of ceilings and floors. In 2013, Armstrong consolidated net sales from continuing operations totaled approximately $2.7 billion. Based in Lancaster, PA., Armstrong operates 35 plants in eight countries and has approximately 8,600 employees worldwide.

 



November 25, 2014


Topic Area: Press Release


Recent Posts

Making the Energy Efficiency Case to the C-Suite

Hospital executives often wrestle with energy decisions made today that either free up budget for patient care or drain resources that could go elsewhere.


Northwell Health Partners with APM Steam to Reduce Energy Consumption

Case study: Northwell Health reduces energy consumption with APM Steam’s proactive maintenance program.


Rethinking Fire Safety Inspections

Digital tools bridge the gap between growing facility complexity and workforce limitations, allowing teams to maintain the highest safety standards.


Cleanliness Is a Measurable Outcome

By restoring the distinction between cleaning and cleanliness, managers and staffs can better protect patients from environmental pathogens.


Workplace Safety and the Role of Access Control

Workplace violence and other issues threaten patients, staff and operations, so managers need to rethink security measures and technology.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.