Overhead Door Brand Introduces Four New Miami-Dade Approved Commercial Sectional Wind Load Doors


 

Overhead Door™ brand, one of the leading manufacturers of garage doors and operators for residential, commercial and industrial applications, has expanded its wind load rated door offerings with the introduction of four new commercial sectional steel garage doors.  These new models, 421, 423, 427 and 429 are designed for durability and strength to help protect the building envelope during extreme high wind events. Each door is approved for use in Florida’s High Velocity Hurricane Zone (HVHZ) in accordance with the test standards in Miami-Dade County, Florida. Notices of Acceptance are (NOA) 17-1207.08 and NOA 17-1207.09 (expirations, November 1, 2023).  

“With the devastation still present from the active hurricane seasons of the past several years, Overhead Door™ brand is committed to serving Florida’s coastal markets with products that offer high wind load design pressures and impact ratings. Each of these elements are critical in helping to protect against the damaging effects of these extreme weather events,” said Bill Loughridge, Overhead Door™ Wind Load Product Manager. “Our new wind load models are not only engineered for use in areas with high velocity wind speeds but are also impact rated, meaning they are designed to help withstand wind-borne debris, a requirement in the High Velocity Hurricane Zone of South Florida.  

In addition to being ideal for commercial applications requiring wind load approval in Fl

Florida’s Miami-Dade and Broward Counties, Sectional Steel Models 421,423, 427 and 429 also serve as an attractive and functional garage door for any business owner. Offering a variety of options, such as steel thickness, backing material, insulation and impact-rated glazing, these new door models provide architects, contractors and building owners flexibility in design and application to best suit their needs.  

 



December 19, 2018


Topic Area: Press Release


Recent Posts

What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Skills Gap Remains Wide in Facilities Management

Many candidates lack the skills that are needed to be a facilities manager.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.