Focus: Interior Design

Painting projects that perform

Manufacturers offer insights on the central role of product selection and substrate preparation


Most institutional and commercial facilities have painted surfaces that are in rough shape. From wear and tear inflicted by occupants and visitors to the passage of time, a host of factors affect their appearance and condition, according to an article from Facilities Maintenance Decisions on the FacilitiesNet website.

To deliver paint and coating application projects that restore these areas, maintenance managers need to understand several issues before starting the job. Perhaps most importantly, managers specifying paints and coatings must consider an array of factors that affect the selection of the most appropriate paint or coating — specifically, the type and location of the substrate to which technicians will apply the coating.

“Floor substrates see more traffic than wall substrates, so going from a wall to a floor, you are increasing the potential for exposure and potential failure of that particular system that is going to be used,” says Mike Mundwiller with Benjamin Moore & Co.

“Very simply put, it’s important to identify what the substrate is — concrete, PVC, sheetrock, or previously coated. It’s also very, very important to take it a step further from what type of substrate it is to questions such as, where is this substrate located? What will it be exposed to? What are the expectations for how long the coating system will last?”

Specifying effective paints and coatings for a paint or coating application is no small task. Several factors go into the decision. To ensure an appealing appearance for facilities and long performance lives for the materials. Managers should not be afraid to ask questions. 

Read the article.

 

 



August 31, 2018


Topic Area: Interior Design


Recent Posts

Reframing the Construction Manager as a Community Manager

Managers must work with patients, community residents and other interested parties to ensure a smooth, successful construction projects


Health First Celebrates 'Topping Off' Ceremony for New Cape Canaveral Hospital Campus

Construction is slated to finish by the end of 2026 or early 2027.


The University of Hawai'i Cancer Center Caught Up in Cyberattack

Investigations are still ongoing to assess other sensitive information that may have been impacted.


Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.