Paralan Introduces the Teracom TCW220 Ethernet Data Logger for Remote Automation and Industrial Controls


TCW220 has two analog inputs, with 10-bit resolution and two discrete inputs. It supports a 1-Wire interface for up to eight Teracom 1-Wire sensors – carbon dioxide, 0/20mA, AC/DC current, temperature, humidity, etc. 

All monitored parameters can be logged on previous set time intervals and/or on alarm conditions. The memory is large enough for at least 36 days with records recorded every minute, up to 70,000 records. The log file can be periodically uploaded on a dedicated server using HTTP Post.

The relays can be activated either remotely (WEB, SNMP, HTTP, MODBUS TCP/IP, etc.) or locally – providing status of monitored parameters. For every parameter, email and SNMP trap can be sent to up to five recipients. Alarm alerts also can be sent by HTTP Post with XML/JSON status files.

Additional Features include:

- Password protected web based configuration and control.
- 2 digital “dry contact” inputs; 2 analog inputs with 0 to 10VDC range, with 10-bit resolution;

- Multiplier and offset for analog inputs;

- 2 relays with NO and NC contacts;

- SNMP v.2 support; SNMP traps to up to 5 recipients like alarm alert;

- MODBUS TCP/IP support; TLS 1.0, TLS 1.1 and TLS 1.2 support;

- Can e-mail alarms and alerts to up to 5 recipients like alarm alert;

- XML/JSON status files; HTTP API commands;

- NTP support; Dynamic DNS support;

- Periodical HTTP Post for client-server systems;

- Remote firmware update.

Paralan (http://www.paralan.com) is now the official USA distributor for Teracom Ethernet Data Loggers. 

Click here to visit the Paralan store page for Ethernet Controllers for general remote control, server room monitoring, SCADA, home and industrial automation over Ethernet - http://www.paralanstore.net/index.php?main_page=index&cPath=141_143

 



November 15, 2017


Topic Area: Press Release


Recent Posts

What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Skills Gap Remains Wide in Facilities Management

Many candidates lack the skills that are needed to be a facilities manager.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.