Phifer's Sheerweave Performance+ receives M1/B2 certification


TUSCALOOSA, Ala. – Phifer is pleased to announce that its full range of SheerWeave Performance+ metallized fabrics is now certified to the rigorous M1 European fire classification standard as well as the B2 German fire standard.  

These test methods measure the ignitability of building products when exposed to a small flame. Flammability testing is arguably one of the most important testing procedures within the textile industry because it has crucial safety implications in the event of a fire.  It has statistically been shown that the major cause of fire fatalities can be directly attributed to the accidental ignition of upholstery and textiles.   

Phifer’s Performance+ offers the maximum in SheerWeave benefits, combining the performance of a traditional SheerWeave fabric “plus” the highly reflective properties of metallization to achieve the ultimate in sun control protection. Acting as a shield at the window, Performance+ fabrics reflect solar heat from the building, reducing the amount of glare at the window and increasing the outward view through the shade while providing an increase in daytime privacy.

Performance+ is available in SheerWeave Style 2390, a 5 percent open basketweave fabric, Style 2410, a 3 percent open basketweave fabric and Style 2500, a 1 percent open basketweave fabric. All styles are available in 63- and 96-inch widths and in 10 neutral colors ideal for any commercial project. 

As with other SheerWeave fabrics, the Performance+ range of fabrics is GREENGUARD Gold Certified, includes Microban® antimicrobial product protection and meets all of the specification requirements for the demanding commercial market. 

For more information on Phifer’s SheerWeave Performance + fabrics, call 205-345-2120 or email inquiries through the website at www.phifer.com.

 



February 3, 2015


Topic Area: Press Release


Recent Posts

Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


Jackson Hospital Falls Victim to Third-Party Cybersecurity Incident

Jackson Hospital has no evidence that any personal information has been or will be used for identity theft as a direct result of this incident.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Stadium Design is Reshaping Healthcare Facilities

Hospitals are turning to the sports industry for innovative ways to support healing and improve the patient experience.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.