Phoenix launches the efficient, compact HDL-LED Series


MILWAUKEE, Wis. – Phoenix Products Company Inc. proudly introduces its latest innovation in LED technology—the HDL-LED Series. The HDL-LED has been designed to replace linear fluorescent fixtures. Using marine grade construction, conformal coated circuit boards and a potted driver, this fixture is designed to withstand the elements. The HDL-LED features a versatile, compact design and provides the essentials for almost any project including several output levels, optic options, mounting capabilities and emergency battery backup. The standard fixture is designed for continuous row mounting. It is designed for machine houses, engine rooms, mining equipment, conveyor lighting and various other demanding applications.

The HDL-LED Series provides 30W, 60W and 90W configurations delivering 3000, 6000 and 9000 lumens, respectively. The fixture features an AC or DC driver with a dimmable option.

The HDL-LED Series is ETL listed to UL 1598 and 1598A with a pending UL 844 (Class I, Div II; Class II, Div I & II; Class III) listing.

The HDL-LED Series easily retrofits to existing Phoenix installations. Numerous repair parts are also available. Designed, engineered, and manufactured in the USA, the HDL-LED Series has a five year limited warranty.

###

A privately held company founded in 1892, Phoenix Products Company Inc. has evolved alongside the city of Milwaukee and is still proud to call it home. Phoenix designs and manufactures superior lighting fixtures for some of the world’s harshest environments. The company provides innovative, high quality products that are built to last and supports them with technical expertise and outstanding customer service. Customers take advantage of Phoenix’s innovative LED options to dramatically increase lifespan, decrease maintenance costs, and significantly reduce energy consumption. For more information on Phoenix, please visit: www.phoenixlighting.com



April 22, 2014


Topic Area: Press Release


Recent Posts

The HVAC Dilemma: To Repair or Replace?

Healthcare facilities that keep repairing and optimizing aging systems past their useful life spend money on a problem they cannot solve without capital investment.


Department of Veterans Affairs Signs Lease for Community-Based Outpatient Clinic in Kentucky

Construction and facility preparation are expected to be completed by the winter of 2027, and the first patient should be seen by spring 2028.


Cameron Regional Medical Center Falls Victim to Ransomware Attack

CRMC is not currently aware of any evidence to suggest that any information has been fraudulently misused.


3 Pillars of Stronger Cybersecurity in Healthcare

These strategies can help healthcare facilities stay ahead of evolving cyber threats.


Meridian Acquires Medical Office Building in Pasadena, CA

The property was acquired for approximately $13.35 million.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.