Planning solar power canopies in parking areas

Solar canopies can reduce winter maintenance and give parking areas a distinctive presence


The adoption of solar technology offers a substantial opportunity to make a meaningful reduction in a building’s carbon footprint while also having significant economic benefits and enhancing building marketability, according to an article on the Building Operating Management on the FacilitiesNet website. 

A thoughtful design approach that situates solar arrays atop parking garages or above parking lots extends savings far beyond energy production, benefitting the bottom line by reducing winter maintenance and other operational costs, while giving parking areas a distinctive presence and offering tenants an extra comfort perk.

This approach to sustainability promotes operational longevity and, as an added benefit, offers a way to install solar panels without the need to puncture building roof membranes.  Solar power generation can be made most effective when it starts with quality design and construction. Upgrading a property with solar technology should not be done in haste; a properly planned system results in maximized efficiency and eliminates difficulties post-construction. Four planning factors have a major impact on success: 

• Involve the state or local government early in the design process

• Be neighborly and conduct glare studies

• Work with experienced vendors 

• Create a logistics plan

Read the article.

 



October 12, 2018


Topic Area: Energy and Power


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.