Protect Jobsites With Surface Shields’ New Fire-Resistant Floor Protector and Seam Tape


Cover Shield’s new material is made in the U.S. and can withstand high impact, fire and liquid. It lays flat and is tear resistant while its embossed pattern adds traction and reduces slippage. Designed with strong adhesive and flexible backing, Seam Tape FR(Part # PETW2180FR)makes seaming and repositioning easy. It also includes a pinked edge for a smooth tear, making it ideal for any kind of fire-rated operation.

On average, firefighters respond to more than 10 fires a day at buildings under construction, according to the National Fire Protection Association. Taking steps to prevent fire-related incidents before they happen is the best way to keep fires from starting and to keep them contained if they do.

To ensure Cover Shield and Seam Tape FR keep jobsites safe, both went through rigorous testing to meet fire-rated standards. Both meet NFPA-701 and Cover Shield also has an ASTME-648 Class 1 rating.

“Keeping a jobsite protected and lowering accident rates starts with prevention,” said Elliot Piltzer, director of business development for Surface Shields.“Cover Shield paired with Seam Tape FR creates an unrivaled fire safety system that can be used in applications ranging from medical, nautical, industrial, government projects, universities, and restoration.” 

Cover Shield is available in 36’’ x 393’ 10 mil, 36’’ x 186’ 20 mil, and special order 40 mil rolls. Seam Tape FR comes in cases of 24 rolls, 1.89 in. by 60 yd., and is designed to be used with any Surface Shields product, both fire-rated and non fire-rated.

 



September 4, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


Skills Gap Remains Wide in Facilities Management

Many candidates lack the skills that are needed to be a facilities manager.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.