Q&A: New construction hazardous rooms

Brad Keyes discusses regulations related to new construction hazardous rooms

By Brad Keyes / Special to Healthcare Facilities Today


Q: One of the units in my hospital is about to go under expansion construction and they are looking to move combustible supplies from a storage room to a room that used to be a break-room in another area on the same floor. The break-room is greater than 50-square feet and the movement of supplies would then consider it a hazardous room. Since the room/facility was built in 2006 and is now considered existing with the adoption of the 2012 LSC, can these supplies be stored in the old break-room if the room is not 1 hour rated? The break-room has sprinklers, a self-closing and positive latching door, and the walls extend from the floor to the ceiling with the ceiling also resisting the passage of smoke.

A: You need to review Chapter 43 of the 2012 LSC. This is a change is use of a room but not a change in occupancy. Section 43.7.1.2 (2) says for existing healthcare occupancies protected throughout by an automatic sprinkler system, where a change in use or a room or space not exceeding 250-square feet results in a room or space that is described in 19.3.2.1.5(7), the requirements for new construction shall not apply provided the enclosure meets the requirements of 19.3.2.1.2 through 19.3.2.1.4.

 What this means is:

•  If your entire building is fully sprinklered;

•  If the break room is not more than 250-square feet

•  If you are moving combustible supplies into that room;

• If the break room meets the requirements for existing hazardous areas (walls, doors, and ceiling that resist the passage of smoke, self-closing positive latching door)

Then yes, your break room does not have to meet new construction requirements and be 1-hour fire rated. It would be permitted to have non-rated walls and doors as long as they are smoke resistant, and the door is self-closing. 

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



July 22, 2020


Topic Area: Regulations, Codes & Standards


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.