ROLO Box Dumper from SP Industries:


SP Industries offers the ROLO Box Dumper– a heavy capacity production dumper used extensively in auto parts production, forging facilities, recycling operations, distribution centers, food processing and waste handling. With a dump angle of 135°, this box dumper is ideal for carts, bins and cans, efficiently handling scrap metals, metal chips, corrugated materials and hospital waste.  Material can be emptied from the ROLO Box Dumper directly into production, into smaller containers, onto a sorting tray, table or conveyor. 

Custom fabrications are standard on the ROLO Box Dumper; cart attachments and scoops can be built to match specific carts/containers. Additional options include PLC controls, hydraulic lock systems for carts, thermo oil heater, side-entry scoop and dumper enclosures.  The dumper has a structural steel frame and high-tensile steel pivot shaft for the ultimate durability and stability. Dual cylinder power adds to stability and increases lifting capacity.

Key specifications for the ROLO Box Dumper:

• Maximum Dump Height: 84”

• Minimum Dump Height: 24”

• Dump Angle: 135°

• No. Cylinders: 2

• Maximum Capacity: 8,000#

• Motor Sizes: 5 HP to 10 HP

• Pump Sizes: 6 GPM to 10 GPM

• Cycle times (sec.): 26 to 137

 

All SP Industries equipment meets or exceeds ANSI and OSHA specifications for safety.

For more information visit: cartdumpers.com.

 



January 29, 2016


Topic Area: Press Release


Recent Posts

5 Reasons Engineering is the Edge in Healthcare Master Planning

The most successful plans go further to unlock smarter investments, improve resilience and enable better patient outcomes.


Building an AI-Ready Healthcare Facility 

Creating a secure, standardized data foundation can help facilities teams put AI to work more effectively.


Family Medical Associates of Raleigh Reports April 2026 Data Breach

The investigation has found evidence that between April 18, 2026, and April 20, 2026, an unauthorized actor intermittently accessed some FMAR systems.


Every Detail Matters: A Patient's Story of Healing, Hope and Healthcare Facilities

In the Facilities in Focus season finale, 11-year-old Kendalynn and her mother share how Intermountain Primary Children’s Hospital became more than a place for care.


Geisinger Wyoming Valley Medical Center Tops Off New 11-Story Tower

The expansion will improve the patient experience by transitioning the hospital to all private patient rooms while significantly increasing clinical capacity.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.