Regarding Light Efficient Design's PL retrofit lamps and Energy Star rating


STATEMENT:

In April 2015, Light Efficient Design received final approval from Energy Star on our LED PL retrofit lamps under the Recessed retrofit program. On June 09, 2015, we announced the approval with a press release.

After making the announcement, EPA/Energy Star representatives notified us that during an internal category evaluation they decided that Light Efficient Design’s PL retrofit lamps should not be grouped with the “non-lamp style retrofits” under this program, since they are lamps and not wired retrofit kits.

We agree that the Light Efficient Design PL Retrofit lamps are not wired retrofit kits. Light Efficient Design’s lamps are designed for maximum installation ease: bypassing the ballast and leaving the original fixture in place. Since there is no category within the Energy Star LED lamp program for PL LED lamps, our PL Retrofit lamp no longer carries the Energy Star.

Light Efficient Design will be modifying current and future inventory to remove or over-mark the Energy Star Logo. We emphasize that the retraction of the Energy Star is due to category evaluation criteria, not to any failure on the part of the PL Retrofit lamps. While the PL Retrofit lamp no longer carries the Energy Star, we are confident that our product is still the best solution when compared to the ballast compatible types on the market: highest energy savings, quicker payback, and far fewer downstream quality issues.

About Light Efficient Design, LLC.

A division of TADD, LLC, Light Efficient Design was founded as a supplier of quality LED retrofit products with a focus on the Electrical Distribution channel. Light Efficient Design’s product line includes LED for HID screw-in retrofits, as well as niche products such as PL, Candelabra, and Linear. Light Efficient Design supplies a full line of LED products to meet commercial, industrial and municipal demand.



July 8, 2015


Topic Area: Press Release


Recent Posts

Reframing the Construction Manager as a Community Manager

Managers must work with patients, community residents and other interested parties to ensure a smooth, successful construction projects


Health First Celebrates 'Topping Off' Ceremony for New Cape Canaveral Hospital Campus

Construction is slated to finish by the end of 2026 or early 2027.


The University of Hawai'i Cancer Center Caught Up in Cyberattack

Investigations are still ongoing to assess other sensitive information that may have been impacted.


Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.