Cabinets in a corridor – Part 1

Q: It appears that the LSC allows up to 50 square feet of unprotected storage but also includes language that suggests it may need to be protected in accordance with 8.7 depending on the level of hazard. It is my experience that storage in a nurse station (even if combustible) is acceptable because it is located in a normally monitored and occupied area. But what about PPE or patient information storage in closed cabinets away from a nurse station? Would this decision be left to the AHJ?

A: In a scenario as you described, I believe it is all about the cabinet and doors. Is the cabinet mounted in such a way that it projects into the corridor by more than 4 inches? If so, that would be a problem. If the doors to the cabinet were to be left open, would the doors project into the corridor more than 4 inches? If so, that too would be a problem. As long as the square footage of the stored items is less than 50 square feet, I don’t see a problem. The cabinet door would not have to meet the requirements for corridor door (i.e. resist the passage of smoke, positive latching hardware, 1¾-inch thickness, solid bonded wood core) as long as the LS drawings delineated that the corridor wall ran behind the cabinet.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



April 4, 2018


Topic Area: Regulations, Codes & Standards


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 