Focus: Fire-Life Safety / Column

Regulations, Codes & Standards Q&A: Door frames

Brad Keyes discusses regulations for door frames

By Brad Keyes / Special to Healthcare Facilities Today


Q: I had an independent Life Safety inspection and during the inspection the inspector cited me for my 2-hour fire door frames not having a fire rating visible. I explained that we went to a fire rated continuous hinge on these doors that covered the labels. He said that that was not enough, he needed to see a label. Should I remove each hinge and take a picture of the fire rating labels?

(The reply for this question comes from Lori Greene, Manager of Codes & Resources at Allegion. Visit Lori’s website on doors and hardware at www.idighardware.com)

A: This topic has come up before, and I asked some AHJs about it since the answer is not found in the codes and standards.  The consensus was that the label should be documented with photos before the hinges are installed – close-up photos to show what is written on the label, and wider photos to show the location of the door.

I’m sure it’s a pain to get this documentation now, but I think that’s the only way to do it for a retrofit situation unless you want to have the doors relabeled.  For new doors and frames, the labels can be applied in another location – on the frame head, and for the doors – either on top or on the lock edge.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



March 28, 2018


Topic Area: Regulations, Codes & Standards


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.