Q: I have two questions regarding spark-ignited emergency power generators:

1. What maintenance tests are required for natural or propane generators?

2. Are load bank test required for natural gas or propane gas powered generators?

A: Monthly tests, but since they are spark-ignited generators they do not have to meet a particular load. They just have to operate with the available EPSS load for a minimum of 30 minutes or until the water temperature and oil pressure have stabilized. (See section 8.4.2.4 of NFPA 110-2010).

No, spark-ignited generators are not required to have an annual load bank tests. An annual load bank test is required when diesel powered generators cannot meet the minimum load of 30% of the nameplate rating (in kW) during each monthly load test. Spark-ignited generators are exempt from having to meet this requirement. 

A 3-year 4-hour load test is required for all generators, including spark-ignited generators. But you are not permitted to use a load bank on spark-ignited generators. The 3-year 4-hour load test must operate using the load from the ATS. For spark-ignited generators, the load is permitted to be the available load. (See section 8.4.9.5.3 of the NFPA 110-2010.) Load banks are not permitted for the 3-year 4-hour load test for spark-ignited generator.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



April 18, 2018


Topic Area: Regulations, Codes & Standards


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.