Revolutionary Fast Installation System - nora nTx Cuts Install Time in Half


nora® nTx is a pre-applied, solvent-free adhesive backing that minimizes prep work and eliminates drying protocols, saving valuable time and money. Previously limited to noraplan® products, nora nTx is now available with norament® floor coverings as well.

Engineered to reduce installation time by as much as 50 percent when compared to standard PVC sheet installation, the revolutionary fast installation system dramatically lowers the total cost of a construction project. With the ability to be installed over existing flooring in renovation projects, further time savings are realized.

“We’ve all heard the statement ‘time is money’. nora nTx is all about saving time,” said Tim Cole, vice president of marketing at nora systems, Inc., North America. “No commercial resilient flooring installs more quickly and effectively. That’s because the system eliminates the use of a wet adhesive. No more spreading adhesives (even with flash coving), replacing worn trowels and waiting for the adhesive to set up, or cure. Installed nora floors with nTx are ready for immediate use, or immediate welding, initial cleaning, and rolling loads. The installer walks out and you move in.”

nora nTx is also resistant to high moisture vapor emissions and extensive pH limits, which eliminates the need for moisture testing and remediation.

“nora nTx installations require fewer materials and put an end to long waits and wasted time,” said Cole. “Contractors don’t have to worry about using the right notch trowel or the open time that comes with using wet adhesives. By eliminating these worries, nora nTx is helping them adhere to tight construction schedules.”

nora flooring with nTx features the same performance benefits, including durability, a simple maintenance regimen, improved acoustics, comfort underfoot, naturally bacteriostatic and fungistatic, stain and slip resistance, improved indoor air quality, with GREENGUARD Gold Certified for low VOC emissions and an extended life cycle— spanning several decades.

To learn more about nora nTx, visit the nora website at www.nora.com/us/ntx.

 



September 7, 2016


Topic Area: Press Release


Recent Posts

Backup Power Is a Lifeline: What Healthcare Facility Managers Must Get Right

From compliance and patient safety to community resilience, facility managers must prioritize preventive maintenance, training and technology to ensure uninterrupted power.


3 Pillars of Stronger Cybersecurity in Healthcare

These strategies can help healthcare facilities stay ahead of evolving cyber threats.


Piedmont Fayette Hospital to Build New Patient Tower

The renovation and expansion project will extend to other areas of the hospital, including surgical services, kitchen, lab, pharmacy and more.


Texas HHSC Announces Construction of New Lubbock Psychiatric Center

The hospital is designed with the latest mental healthcare standards in mind to promote recovery and healing.


Armed Standoff at West Virginia Hospital Reminds of the Need for Safety Measures

The alleged suspect, who's now in custody, was also linked to earlier bomb threats.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.