RightDry Technology Now Available Option with Munters Integrated Custom Air Handler (ICA) System


Munters state-of-the-art Integrated Customer Air Handler (ICA) can now be equipped with RightDry™ technology to allow customers to select a higher efficiency dehumidifier with low-temperature reactivation sources. With the ability to integrate a desiccant dehumidifier with other air conditioning components, the ICA is an energy-efficient humidity and temperature control solution available in a variety of tailor-made configurations to meet specific customer applications.

The ICA system includes a dehumidifier and nine desiccant rotor size options, heating and cooling coils, refrigeration package and supply and return HEPA filters. With the option to incorporate RightDry technology, customers can use low temperature reactivation sources for applications that require supply air delivered at 15gr/lb (20°F dew point) or above.

ICA with RightDry enables customers to use hot water as low as 100° F or low pressure steam from a boiler or waste energy source as a regeneration source, while allowing for tight humidity control. This technology results in improved moisture removal efficiency (MRE) and yield annual operating cost savings.

“The ICA with RightDry technology offers a robust product with higher moisture removal efficiency (MRE) for applications that do not require deep drying,” said Chris Jensen, Munters product manager Americas. “It provides a greener alterative by using waste energy from another source.”

“Munters is well known in the industrial marketplace for energy efficient low dew point solutions,” said Andrew Cook, industrial segment director. “The RightDry gives us another energy efficient option, while providing our customers with the same trusted products and solutions.” 

The ICA with RightDry™ is available in configurations of up to 100,000 cfm, and is manufactured in Munters’ Amesbury, Mass. facility.

For more information, visit www.munters.com.



November 22, 2016


Topic Area: Press Release


Recent Posts

Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


Inland Empire Health Plan Opens Expanded San Bernardino Community Wellness Center

The new 33,000-square-foot center is nearly three times the size of the original location off Second Street.


Rethinking Parking Lot Design at Irvine Heritage Medical Plaza

A new solar installation shows how healthcare facilities can improve parking amenities while boosting energy savings


Repurposing Healthcare Spaces: 5 Critical Questions

Done well, converting existing spaces can trim upfront project costs by up to 40 percent, compared with ground-up construction


Disinfectant Contact Time: The Case for Biofilm Disruption

Contact time, while essential for compliance, does not reliably predict microbial reduction on actual healthcare surfaces.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.