Rinnai Launches Demand Duo 2 Hybrid Commercial Water Heating System


Rinnai Corporation, manufacturer of the number-one selling brand of tankless gas water heaters in North America, announces an exciting new addition to its commercial water heating lineup – the Demand Duo™ 2.

Building off the success of its current line of commercial products, the Demand Duo 2 combines the hybrid technology of the Demand Duo product family with the redundancy and performance of its commercial rack systems. The system features a 119-gallon storage tank along with two CU199 Rinnai Tankless Water Heaters that work together to offer the best benefits of both tank and tankless technology.

“We’ve already seen a huge amount of success with the Demand Duo line,” said Dale Schmitz, Marketing Manager at Rinnai America Corporation. “The great thing that the Demand Duo 2 does for us is that it allows us to scale up that technology and offer a solution that works for commercial customers who have higher hot water demands.”

In addition to its built-in redundancy and strong performance, Demand Duo 2 offers longer life, lower operating costs, easier serviceability and maintenance, a longer warranty and better technology. The system is also lighter and takes up less space than competitive products, requires no ASME certification or inspections and has the most venting options in the industry.

To learn more about Demand Duo 2, along with other commercial solutions from Rinnai, visit www.rinnai.us.

 



October 8, 2018


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.