Rush Memorial Expands Treatment Capacity with Renovation


Healthcare environments need the ability to flex their patient care spaces to meet fluctuating demand. With physical environments, this is not easy to achieve. Design Collaborative recently worked closely with Rush Memorial Hospital to modernize its Med-Surg space to better serve its patient community and medical staff. Through strategic programming and planning, the design team was able to fit eight (8) private rooms and one (1) step-down ICU beds in the renovated space. The former multi-patient rooms were converted to private rooms with the capability of accommodating a second patient when circumstances require.  Future planned renovations will introduce upwards of six (6) more beds to the unit.

All but two of the private rooms are fitted with a primary and secondary headwall. The secondary headwall has all the same functions as the primary headwall. However, when not in use, the secondary headwall serves as storage with the primary services designed to be hidden. This allows for private rooms to function as semi-private rooms when the census or other circumstances dictate. The added flexibility of the patient rooms allows the hospital system to have a total capacity of 15 functioning beds on the Med-Surg unit when demand or needs require it.

The changes to the Med-Surg floor also included the relocation and expanded renovation of the nurse station and supporting functions to not only increase collaboration among staff but also provide better wayfinding and access to patients. All work was completed in phases to allow for the continual operation of the Med-Surg floor and service to the community. The outcome of the renovation hopes to have a direct, positive impact on Rush Memorial’s HCAHPS scores. The project completed in March 2020 and included approximately 5,800-square-feet of space. To learn more about Design Collaborative, please visit the website.



July 6, 2020


Topic Area: Press Release


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.