Russelectric Emergency Power System Offers Redundant PLC Controls and Manual Backup Capability


Russelectric, a leading manufacturer of automatic transfer switches and power control systems offers its robust and reliable Emergency Power System which provides backup power during a utility power loss. The paralleling switchgear systems offer redundant programmable logic controller (PLC) controls and manual backup capability. Trusted by the largest critical facilities in the world, the Russelectric Emergency Power System has been used by hospitals, data centers, telecommunications and banking facilities, as well as airports, water and waste water, and renewable energy facilities.

Complete systems are custom designed and fully manufactured by Russelectric. All systems are UL listed and can incorporate such sophisticated control functions as peak shaving and load curtailment. Russelectric paralleling systems incorporate dual, redundant, hot synchronized PLCs for system control. The unique system design allows manual start and synchronization of generator sets if automatic controls malfunction. Discrete switches, meters and control devices are standard to allow manual control capability in the event that both system PLCs fail.

Designed for maximum safety and operating simplicity, the systems are supervisory control and data acquisition (SCADA)-capable. A 23-inch LCD HMI touchscreen display enables operators to view system one-line diagrams, alarms, and setpoints.

Load demand sensing determines the number of engine generators in operation based on the loading. The system permits first priority loads to transfer to the connected engine generator set, while delaying the transfer of lower priority loads until additional generator capacity has been connected. Lower priority loads then transfer to the emergency power system as generator sets are added to the bus.

For more information contact us at info@russelectric.com



December 13, 2018


Topic Area: Press Release


Recent Posts

Reframing the Construction Manager as a Community Manager

Managers must work with patients, community residents and other interested parties to ensure a smooth, successful construction projects


Health First Celebrates 'Topping Off' Ceremony for New Cape Canaveral Hospital Campus

Construction is slated to finish by the end of 2026 or early 2027.


The University of Hawai'i Cancer Center Caught Up in Cyberattack

Investigations are still ongoing to assess other sensitive information that may have been impacted.


Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.