Russelectric Emergency Power System Offers Redundant PLC Controls and Manual Backup Capability


Russelectric, A Siemens Business, a manufacturer of power control systems and automatic transfer switches, offers its robust and reliable Emergency Power System which provides backup power during a utility power loss. The paralleling switchgear systems offer redundant programmable logic controller (PLC) controls and manual backup capability. Trusted by the largest critical facilities in the world, The Russelectric Emergency Power System has been used by hospitals, data centers, telecommunications and banking facilities, as well as airports, water and waste water, and renewable energy facilities.

Complete systems are custom designed and fully manufactured by Russelectric. All systems are UL listed and can incorporate such sophisticated control functions as peak shaving and load curtailment. Russelectric paralleling systems incorporate dual, redundant, hot synchronized PLCs for system control. The unique system design allows manual start and synchronization of generator sets if automatic controls malfunction. Discrete switches, meters and control devices are standard to allow manual control capability in the event that both system PLCs fail.

Designed for maximum safety and operating simplicity, the systems are supervisory control and data acquisition (SCADA)-capable. A 23-inch LCD HMI touchscreen display enables operators to view system one-line diagrams, alarms, and setpoints.

Load demand sensing determines the number of engine generators in operation based on the loading. The system permits first priority loads to transfer to the connected engine generator set, while delaying the transfer of lower priority loads until additional generator capacity has been connected. Lower priority loads then transfer to the emergency power system as generator sets are added to the bus.

For more information contact us at info@russelectric.com or 800 225-5250.



April 21, 2020


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.