Russelectric Offers Prime Power Systems


Russelectric, a leading manufacturer of automatic transfer switches and power control systems offers its Prime Power Systems, which are used for automatic operation of on-site power generators to serve a facility’s entire load. The Prime Power Systems are used as the primary source of power to a facility. Generator paralleling controls provide active synchronization and soft loading control of the engine generators based on load demand.

All Russelectric Prime Power systems are UL listed, offer programmable logic controller (PLC) system controls, and are supervisory control and data acquisition (SCADA)-capable.

In prime power applications, engine generators are run in response to the connected load. If load increases to a predetermined level, the Russelectric Prime Power System automatically starts additional generators, synchronizes them to the generator bus, and shares the load with the running generators. If load decreases to a predetermined level, excess generators are automatically removed from the bus and shut down, returning them to automatic standby status.

For more information contact us at info@russelectric.com or 800 225-5250.



April 25, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.