Russelectric, a leading manufacturer of automatic transfer switches and power control systems offers its Prime Power Systems, which are used for automatic operation of on-site power generators to serve a facility’s entire load. The Prime Power Systems are used as the primary source of power to a facility. Generator paralleling controls provide active synchronization and soft loading control of the engine generators based on load demand.
All Russelectric Prime Power systems are UL listed, offer programmable logic controller (PLC) system controls, and are supervisory control and data acquisition (SCADA)-capable.
In prime power applications, engine generators are run in response to the connected load. If load increases to a predetermined level, the Russelectric Prime Power System automatically starts additional generators, synchronizes them to the generator bus, and shares the load with the running generators. If load decreases to a predetermined level, excess generators are automatically removed from the bus and shut down, returning them to automatic standby status.
For more information contact us at info@russelectric.com or 800 225-5250.
State of the Facilities Management Industry in 2025
City of Hope to Open New Cancer Specialty Hospital in California
Montefiore Einstein Opening New Inpatient Center for Youth in the Bronx
Skill Stacking: How Micro-Credentials Are Reshaping Trades
Prima Medicine Opens New Location in Tysons, Virginia