Russelectric Offers Prime Power Systems


Russelectric, a leading manufacturer of automatic transfer switches and power control systems offers its Prime Power Systems, which are used for automatic operation of on-site power generators to serve a facility’s entire load. The Prime Power Systems are used as the primary source of power to a facility. Generator paralleling controls provide active synchronization and soft loading control of the engine generators based on load demand.

All Russelectric Prime Power systems are UL listed, offer programmable logic controller (PLC) system controls, and are supervisory control and data acquisition (SCADA)-capable.

In prime power applications, engine generators are run in response to the connected load. If load increases to a predetermined level, the Russelectric Prime Power System automatically starts additional generators, synchronizes them to the generator bus, and shares the load with the running generators. If load decreases to a predetermined level, excess generators are automatically removed from the bus and shut down, returning them to automatic standby status.

For more information contact us at info@russelectric.com or 800 225-5250.



April 29, 2019


Topic Area: Press Release


Recent Posts

What 'Light' Daily Cleaning of Patient Rooms Misses

Most environmental services workers still clean as if they were wiping dust off a countertop, not disrupting a living, structured community.


Sprinkler Compliance: Navigating Code Mandates, Renovation Triggers and Patient Safety

As CMS deadlines approach and renovation projects accelerate, healthcare facility managers must understand how NFPA 101, state fire codes and sprinkler design strategies intersect.


MUSC Board of Trustees Approves $1.1B South Carolina Cancer Hospital

Research and education are intentionally embedded in the hospital’s design, with dedicated spaces for scientific collaboration, clinical investigation and training.


Study Outlines Hand Hygiene Guidelines for EVS Staff

Researchers find that current guidelines for hand hygiene don’t include EVS workers and suggest indicators to fill that gap.


McCarthy Completes $65M Sharp Rees-Stealy Kearny Mesa MOB Modernization

The completed tenant improvement includes approximately 100,000 square feet of improved space across two buildings and represents an investment of $65 million.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.