Russelectric Offers Prime Power Systems


Russelectric, a leading manufacturer of automatic transfer switches and power control systems offers its Prime Power Systems, which are used for automatic operation of on-site power generators to serve a facility’s entire load. The Prime Power Systems are used as the primary source of power to a facility. Generator paralleling controls provide active synchronization and soft loading control of the engine generators based on load demand.

All Russelectric Prime Power systems are UL listed, offer programmable logic controller (PLC) system controls, and are supervisory control and data acquisition (SCADA)-capable.

In prime power applications, engine generators are run in response to the connected load. If load increases to a predetermined level, the Russelectric Prime Power System automatically starts additional generators, synchronizes them to the generator bus, and shares the load with the running generators. If load decreases to a predetermined level, excess generators are automatically removed from the bus and shut down, returning them to automatic standby status.

For more information contact us at info@russelectric.com or 800 225-5250.



April 29, 2019


Topic Area: Press Release


Recent Posts

Biofilm 'Life Raft' Changes C. Auris Risk

Microscopic survival structure protects fungal pathogen from disinfectants and help it survive for long periods.


How Healthcare Restrooms Are Rethinking Water Efficiency

Manufacturers discuss strategies, technologies and design approaches that help healthcare facilities meet their sustainability goals.


Northwell Health Finds Energy Savings in Steam Systems

Case study: A proactive steam trap maintenance program is delivering millions in savings, fast payback and measurable carbon reductions across one of the nation’s largest health systems.


The Difference Between Cleaning, Sanitizing and Disinfecting

Cleaning methods and products have various purposes in reducing the spread of germs.


Jupiter Medical Center Falls Victim to Third-Party Data Breach

The third party has determined through an investigation that, at least as early as January 22, 2025, an unauthorized third party gained access to personal health information on legacy systems.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.