STARC Systems Manufactures Modular, Re-usable Temporary Containment Walls


STARC Systems manufactures modular, re-usable temporary containment walls for use in a variety of verticals including healthcare settings when there’s a need to protect sensitive occupied areas from the disruption of renovation. 

STARC’s solution is superior to traditional drywall containment, which is noisy and messy to build, disruptive to patients and staff, creates lots of dangerous dust and is thrown out after every job. It takes two people two days to build 100 feet of drywall temporary containment.

STARC’s temporary containment system is quick and quiet to install and 2 people can put up 100’ of wall in one hour with no tools, noise or disruption. The simple lift and drop connection creates an instant airtight connection between the panels.

The 3-layer construction of our panels contain a sound attenuating foam core that eliminates up to 50% of renovation noise which benefits patients, staff,and visitors. Because the system is reusable, it can be used on 100s of jobs and pays for itself after 3-5 uses, virtually eliminating future material and labor temporary containment costs.

 



August 14, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.