The UC San Diego Jacobs Medical Center central plant has been certified as a LEED Gold building, according to an article on the Medical Construction & Design website.
It is the first stand-alone medical center energy plant to achieve this distinction.
The 40,000-square-foot plant will ultimately support 900,000 square feet of hospital space.
The two-story building includes three 1,300-ton chillers which will generate enough chilled water to fill 10 Olympic-sized swimming pools each day.
How Can Healthcare Facilities Use Efficiency to Drive Climate and Health Goals?
El Camino Health Rehabilitation Hospital Officially Tops Out
Vibra Hospital of Sacramento Reports Data Breach
EV Charging Station Design: Ensuring Patient Access
Sanford Health and Prairie Lakes Healthcare System Merge