Self-fusing tape creates a chemical and moisture resistant barrier

By Healthcare Facilities Today


Vernon Hills, Ill. – Rust-Oleum Industrial Brands has introduced LeakSeal Self-Fusing Silicone Tape – a silicone repair tape that conforms to any surface to provide a water-tight seal.

LeakSeal Tape exhibits self-fusing technology by creating an air-tight bond. LeakSeal does not stick to the substrate to which it is applied but rather fuses with itself. It demonstrates extreme strength by withstanding 700 PSI, is extremely resistant to temperatures that range from minus 85 degrees Fahrenheit up 500 degrees Fahrenheit, and can withstand most solvents, acids and oils.  

The tape is very easy to apply. Simply dry the substrate that needs repair, hold the tape firmly on the problem area, stretch and apply the tape overlapping each layer by half an inch.  Cut the tape once finished and press firmly in place. LeakSeal Tape is easy to remove and leaves no sticky residue.

“LeakSeal Tape is a very versatile product,” said Rust-Oleum product manager Kelly Markle.  “It’s perfect for fixing leaky pipes and hoses or for insulating frayed electrical wires. Unlike other tapes on the market, this product goes unmatched in heat, corrosion, insulation and pressure resistance. It’s a must-have for every commercial or industrial facility.”

LeakSeal Tape is available in 10 foot rolls in Black and Opaque. For more information visit www.rustoleum.com/industrialleaksealtape.

 



October 24, 2013


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.