Shawnee Mission Medical Center Opens a New Hybrid Operating Room


Shawnee Mission Medical Center recently opened a new hybrid operating room, designed by health care architecture firm Pulse Design Group and constructed by general contractor United Excel.

The 3,550 square-foot surgical space was converted from an outdated clinical area and is now the city’s largest hybrid operating room, helping to better serve SMMC’s current and prospective patients. Designed to enhance patient safety and outcomes, the operating room is equipped with advanced diagnostic imaging equipment to enable minimally-invasive heart and vascular surgeries. The multidisciplinary space allows health care professionals from different specialties to treat patients in the same location. Procedures that can be performed will include Transcatheter Aortic Valve Replacements (TAVR), electrophysiology, vascular procedures and cardiac catheterization.

Architectural details include a flexible floor plan that was developed and vetted by nurses and physicians with the aid of virtual reality, custom solid surface casework provided by Shield, and an elevated control desk for optimal patient viewing. The advanced room design allows for a patient to transition from an interventional catheter-based procedure to a surgical procedure without being transported to another setting. Pulse Design Group Principal Rick Embers said, “Our firm has designed hybrid operating rooms for numerous clients, but the new hybrid operating room at Shawnee Mission Medical Center is by far the most spacious and technologically advanced. It sets the highest standards for future hybrid operating rooms.”

Most of the work on this renovation was completed after normal business hours to meet the expedited schedule and to minimize disruptions to patients and ongoing operations. Lucy Campbell, project manager with United Excel, said, “United Excel was selected because of their previous hybrid operating room construction experience, approach to managing a challenging schedule and budget as well as proven expertise with top notch infection control processes and procedures. The result was a world-class hybrid operating room for Shawnee Mission Health so they could better serve the community.”

Greg Highbarger, design and construction manager at SMH, said “The complexities of the hybrid operating room project provided a number of unique challenges, but the synergy of our design and construction partners defused any concerns that our project would not be completed on time and under budget. The success of our new state-of-the-art hybrid operating room is a testament to having the right expertise at each phase of the project.”

Visit us online at ShawneeMission.org.




April 16, 2018


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.