DPR Construction recently marked the topping out of the Southwest Healthcare Inland Valley Hospital expansion project in Wildomar, CA.
The new seven-story, 290,000-square-foot patient tower will accommodate 102 beds to support Riverside County’s growing population. The campus will be equipped with leading-edge clinical technologies for minimally invasive procedures and advanced therapies, and sustainable infrastructure including energy-efficient LED fixtures and solar panels.
As the only designated Trauma Center in Southwest Riverside County, the existing healthcare campus has remained fully operational throughout construction. The project team relocated every major utility that sat in the footprint of the new tower.
More than 600 local workers from a variety of trades have worked 173,200 hours to bring the project to this point.
Making the Energy Efficiency Case to the C-Suite
Rethinking Fire Safety Inspections
Northwell Health Partners with APM Steam to Reduce Energy Consumption
Cleanliness Is a Measurable Outcome
Workplace Safety and the Role of Access Control