Spirax Sarco releases STS17.2 steam trapping station


Spirax Sarco, the leader in products and services for steam system solutions is pleased to announce the release of the STS17.2 Steam Trapping Station.  The STS17.2 is a complete assembly comprised of an isolation valve, a steam trap connector with strainer and a check valve in a sleek, modular body.  The convenient ‘ready-to-install’, single-piece body virtually eliminates potential leak paths caused by multiple screwed connections that conventional steam trapping stations and on-site fabricated installations typically include. 

The STS17.2 steam trapping station technology allows a steam trap to be changed in minutes rather than hours, reducing plant downtime and ensuring hassle-free maintenance.

Features and benefits include:

• Quick and simple maintenance of the steam trap with simple two-bolt connector, reducing system downtime and maintenance costs

• Innovative leak free body design that reduces carbon footprint

• Ability to integrate steam trap monitor allows for quick recognition of trap failure

• Pre-assembled construction makes installation quick and easy

• High performance stainless steel components for long, trouble-free service

About Spirax Sarco, Inc. 

For engineers around the world Spirax Sarco is synonymous with excellence in steam system management. We offer the industry’s most extensive range of products and services, coupled with expertise based on over a century of practical application across a variety of industries. In short we create the solutions that set the benchmark for steam-using organizations worldwide, working alongside them to improve productivity, save energy and reduce waste.

 



September 24, 2015


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.