Suffolk Breaks Ground on Expansion of White Plains Hospital

The 10-story, approximately 500,000-square-foot expansion is slated to open in 2028.

By HFT Staff


Suffolk recently celebrated the groundbreaking of White Plains Hospital’s new expansion. The 10-story, approximately 500,000-square-foot expansion will provide a state-of-the-art facility for the Hudson Valley’s more than two million residents when it opens in 2028. 

Upon completion, the expansion will increase licensed bed capacity from 292 to 436, ultimately adding 240 private rooms, 144 of which will open in 2028; it will create a dedicated operating room floor with space for 10 additional state-of-the-art operating rooms equipped with the latest technology to support the increasingly complex care the hospital provides; and more than double the size of the hospital's emergency department. 

Among the various technologies Suffolk’s project team has used on this project, the team utilized the Live Dimensions Steel Tracker, a proprietary technology that uses AI to track steel use and progress on projects, from the design phase through the completion of construction. Suffolk has also deployed NavVis, to capture high-quality data that is integrated into cloud-based collaboration platform Revizto to maximize cooperation across project teams. 



July 3, 2025


Topic Area: Construction


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.