Focus: New Construction
Sutter Health combines two sites into new facility to meet seismic requirements
New million-square-foot California Pacific Medical Center Van Ness campus takes up entire San Francisco city block, according to an article on the Healthcare Design website
Sutter Health combined two sites into new facility to meet seismic requirements. The new million-square-foot California Pacific Medical Center Van Ness campus takes up entire San Francisco city block, according to an article on the Healthcare Design website
Read the article.
November 6, 2019
Topic Area:
Architecture
Recent Posts
Extra penetrations, tight clearances and strict humidity needs—design experts explain what it really takes to plan dedicated units for each operating room.
Sutter projects the medical center will open in late 2031.
Construction is scheduled to begin in 2027 with completion expected by 2030.
No accepted criteria exist for defining a surface as clean using microbiologic methods.
Case study: A renewed partnership with Siemens helps the senior living provider meet NFPA 70B standards, reduce risk, and enhance reliability across its communities.