Focus: New Construction
Sutter Health combines two sites into new facility to meet seismic requirements
New million-square-foot California Pacific Medical Center Van Ness campus takes up entire San Francisco city block, according to an article on the Healthcare Design website
Sutter Health combined two sites into new facility to meet seismic requirements. The new million-square-foot California Pacific Medical Center Van Ness campus takes up entire San Francisco city block, according to an article on the Healthcare Design website
Read the article.
November 6, 2019
Topic Area:
Architecture
Recent Posts
New research from the Carpet and Rug Institute finds that carpet supports healthier indoor environments.
The hospital is scheduled to open in June 2028.
A file containing limited patient information was inadvertently uploaded to an external artificial intelligence (AI) platform.
When someone faces a serious medical condition, having access to world-class care close to home can make all the difference.
Case study: How APM Steam helped Atrium Health Cabarrus uncover hidden steam system inefficiencies and build an actionable repair plan with a projected $144,949 in annual energy savings.