Focus: New Construction
Sutter Health combines two sites into new facility to meet seismic requirements
New million-square-foot California Pacific Medical Center Van Ness campus takes up entire San Francisco city block, according to an article on the Healthcare Design website
Sutter Health combined two sites into new facility to meet seismic requirements. The new million-square-foot California Pacific Medical Center Van Ness campus takes up entire San Francisco city block, according to an article on the Healthcare Design website
Read the article.
November 6, 2019
Topic Area:
Architecture
Recent Posts
Traditional responses — building more primary and secondary care facilities — are no longer sustainable.
The organization broke ground on the health campus in March 2024.
The facility will now be known as Touchmark at Georgetown.
So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.
Almost half of power outages in the United States were caused by extreme weather events.