Tectum Structural Acoustical Roof Decks from Armstrong Building Solutions Offer Excellent Acoustics, Versatility, and Sustainability


Tectum Structural Acoustical Roof Deck solutions from Armstrong Building Solutions provide predictable noise absorption, durability, and sustainability to meet building design needs. Composite roof deck options provide R-values up to 44. By providing noise absorption up to 0.80, the panels often eliminate the need for additional acoustical treatments, providing faster and easier installations than standard steel roof decks.  

Tectum Roof Decks are an ideal noise reduction solution for large, high traffic, exposed structure spaces such as auditoriums, gymnasiums, arenas, pools, ice arenas and multi-use facilities. Tectum Roof Deck panels also help meet ANSI S12.60 Acoustical Performance Criteria for learning spaces such as gymnasiums.  

Tectum Roof Decks are composed of rapidly renewable and FSC-certified aspen 
wood fiber that is bonded with an inorganic hydraulic cement for maximum durability and performance. Tectum 1 (non-composite panels) meet the most stringent sustainability criteria, including EPD, HPD, and Declare℠, and contribute favorably to LEED® v4, and the Living Building Challenge℠.

Variety of Systems

Tectum Roof Deck solutions in plank or tile configurations are available in a wide variety of system configurations to address a building’s design requirements in low slope applications and are compatible with virtually all roofing materials, providing a thermal barrier for field-applied foam plastics.

Tectum Composite Roof Deck panels are typically used in sloped applications where acoustics, insulation, a nailable surface, and structural integrity are all important. An NRC up to 0.80 provides predictable acoustics, often eliminating the need for additional noise reducing materials.

For additional information on Tectum Roof Deck panels from Armstrong, visit armstrongbuildingsolutions.com.

 



July 12, 2018


Topic Area: Press Release


Recent Posts

UCI Health Set to Open First All-Electric Hospital

All-electric acute care hospital aims to help University of California’s goal of reducing 90 percent of total carbon emissions by 2045.


Ground Broken on Baptist Health Sunrise Hospital

The planned seven-story, 340,000-square-foot facility is expected to open to patients in 2029.


Rapid City Medical Center to Join Monument Health

The parties will perform further due diligence with the intention to sign definitive agreements and close on the transaction later this spring.


AI Adoption on the Rise Among Leaders

AI usage increased in all markets in the fourth quarter of 2025.


TriasMD Officially Opens DISC Surgery Center at Tarzana

At 10,930 square feet, DISC Surgery Center at Tarzana includes three high-technology operating rooms and 11 patient care bays.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.