Case study

The power needed to deliver quality healthcare

Along with life safety backup power needs, Hendricks Regional Health wanted a backup system that would support air-conditioning for the entire hospital facility


Hendricks Regional Health is a county-owned, Level-I hospital. In January 2018, the hospital opened a $50 million, 96,000 square-foot facility in Brownsburg, Ind. Its focus is on serving the community with patient-centered, high-quality, yet affordable care. Poised for growth, hospital management is already planning to expand the campus to accommodate future surgical operations.

When the need arose to evaluate backup power solutions, the Hendricks facility management team took a proactive vision and innovative approach. Along with life safety backup power needs, Hendricks wanted a backup system that would support air-conditioning for the entire hospital facility. While air conditioning is not required by Indiana code, the additional backup capacity would ensure patient comfort in the event of utility power failure.

Wurster Construction - construction management, BSA Life Structures - architect, and EVAPAR - Generac distributor, secured the project bids. EVAPAR and the project team at Generac brought Hendricks facility manager Troy Tucker to Generac test labs and production facilities in Wisconsin. Together, the team evaluated Generac Modular Power System (MPS) configurations that were subjected to multiple failure scenarios. The MPS solution they devised enabled the units to cycle their gear and “think” independently of each other. In other words, a problem with one unit would not compromise the others, and that’s what impressed Tucker—uptime is critical for any hospital.

The original design was based on a single, 1 MW generator. EVAPAR recommended a paralleled 2 x 500 kW diesel-fueled MPS solution which increased redundancy to life safety and critical loads. In order to optimize the MPS solution for the current hospital load and future expansions, the team chose a modular air-conditioning solution from Multistack. Like the generators that power it—Multistack solutions are designed to expand easily as facility requirements change. Each diesel-fueled unit sits on a 300 sub-base fuel tank, which draws from a 1,200 gallon above-ground, bulk storage fuel tank. Essentially, even the fuel supply has a backup.

 



October 17, 2018


Topic Area: Energy and Power


Recent Posts

How Designers Create Welcoming Senior Care Communities

Risk assessments and cost analysis play a role in creating thriving communities.


Data-Driven Decisions: How Analytics Are Shaping Healthcare Facility Planning

Hospitals can use data to prioritize upgrades, extend building lifespans and maximize the impact of limited capital budgets.


UC Health Opens Expanded Freeman Center for Developmental Disabilities

Every detail of the new Freeman Center was informed by input from patients, caregivers, self-advocates and community partners.


Upward Mobility: Market Forces Drive Hospitals Higher

Healthcare facilities nationwide are navigating challenges and opportunities presented by expanding their reach into the sky.


Georgia Hospital Bomb Hoaxes Highlight Need for Healthcare–Police Partnerships

Proactive planning and close collaboration with law enforcement help healthcare facilities maintain safety and continuity during false threats.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.