Tubelite debuts 34000 Series storefront


Walker, Michigan - Tubelite introduces 34000 Series storefront system, engineered for hurricane resistance. This new product will be on display in booth #4634 at the American Institute of Architects (AIA) Convention and Expo 2014.

Tubelite’s new 34000 Series storefront is offered as either a non-thermal system or with a single poured-and-debridged thermal improvement option. Both choices easily accommodate insulated glass. 

Enhancing the product’s environmental attributes, the aluminum used to produce Tubelite’s storefront systems can be extruded using EcoLuminum™, a high recycled-content aluminum billet composition with eco-friendly, durable finishes. 

To learn more about Tubelite’s new 34000 Series storefront system design details, test reports, installation instruction and specific performance data, please visit http://www.tubeliteinc.com.

Tubelite was established in 1945 and is part of Apogee Enterprises, Inc. The company’s headquarters, distribution, warehousing and assembly operations are in Walker, Michigan. Its facility in Reed City, Michigan, houses the company’s aluminum extrusion operation. In 2011, the company expanded with an additional facility in Dallas/Fort Worth, Texas, and offices in Rockhill, South Carolina, to better serve clients working in the southern states. 

Tubelite and its staff are members of the American Architectural Manufacturers Association (AAMA), the American Institute of Architects (AIA), the Construction Specifications Institute (CSI), the Glass Association of North America (GANA), and the U.S. Green Building Council (USGBC).

 



June 26, 2014


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.