UCHealth Breaks Ground on Major Expansion Project

The project includes a new tower and a cancer center.

By HFT Staff


UCHealth officially broke ground on a major expansion project at Medical Center of the Rockies (MCR) that will help meet the growing healthcare needs of northern Colorado.    

The project includes a new tower that will be built on the north side of the hospital, the creation of a cancer center, an expanded emergency department and additional imaging and cardiac spaces. When complete, the project will increase the hospital’s bed capacity from 191 to 287 with room to grow up to 323 beds. Staffing will grow as well. UCHealth expects to hire more than 250 employees before the expansion opens.    

The cancer center is expected to begin seeing patients in 2024, and the new tower is expected to open in 2026.   

The $280 million project will include:    

  • A five-story tower that will house a surgical intensive care unit, a progressive care unit and a trauma surgical unit. The tower will also house a radiation oncology department that will feature high-dose radiation therapy, which patients currently travel to metro Denver to receive, and a linear accelerator.  
  • The cancer center will feature a new gynecological oncology clinic, a medical oncology clinic and an infusion center.   
  • The emergency department will expand to include 22 new patient care rooms and a new entrance.   
  • A new cardiac catheterization lab, a cardiac device lab, a structural heart lab and a vascular lab will be added to the south side of the existing hospital building.    
  • Imaging will be expanded with additional CT, ultrasound and MRI services and an interventional radiology suite on the east side of the existing hospital building.    
  • Parking will be expanded for patients and staff.  

The expansion is a part of the original plans for the campus to accommodate service growth over time. The new tower will be connected directly to the existing facility and carry forward its northern Colorado design character. The interior of the new tower will be open and bright, capturing views of the mountains and plains.   

Haselden Construction is the general contractor on the project and is supported by The S/L/A/M Collaborative, the architect; BHA Design, Inc, the landscape architect; RMH Group, the mechanical, electrical and plumbing team; Olsson, the civil engineer; S.A. Miro, the structural engineer; and Gallun Snow, the interior designer.  

 

 



January 8, 2024


Topic Area: Construction


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.