Viega Introduces New Insulated PEX Barrier Piping System


Viega introduced its ProRadiant™ Insulated PEX Barrier Piping System for its snow melting system. The piping system is ideal for applications including helipads, loading docks, parking garages and stairs.
 
The Insulated PEX Barrier Piping System’s superior insulation results in a reduction in heat loss over competitive products in the market. The system’s high-compressive strength makes it ideal for burial under areas with high traffic loads or foot traffic. The “smart” membrane between the outer casing and insulation enhances and maintains the insulation value, keeping operating performance high throughout the pipe’s service life.
 
The bonded system eliminates risk of water penetration and no special considerations for thermal expansion are required. The polyethylene (LDPE) jacket resists any impact or blows incurred during the installation or transportation. The piping system is UV-treated, requires no special tools for assembly and is available in long coils or custom coil lengths.
 
“The Viega ProRadiant™ Insulated PEX Barrier Piping System is designed to add value and quality to countless snow melting projects,” said Joshua Quint, product manager, heating and cooling at Viega. “The system is easy to specify, design and quote projects. It is proven to be one of the top insulated piping systems on the market.”
 
Viega offers snow melt systems for a multitude of commercial and residential applications. Viega ProRadiant incorporates time-tested radiant technology and highly efficient, automatic controls that detect snow and ice when it is below certain temperatures outside. Viega’s Design Services team offers radiant and snowmelt system design support. Visit the design services section on www.viega.us to learn more and access a snow and ice melt design request form. For more information, visit www.viega.us.

 

 


August 11, 2017


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.