WECC Energy finance solutions makes solar electricity accessible to Hawaii residents


Energy Finance Solutions (EFS), a division of WECC, has partnered with the State of Hawaii’s Green Energy Market Securitization (GEMS) Program to help make clean energy improvements accessible to Hawaii utility customers. EFS developed financing options intended to make the purchase and installation of solar photovoltaic systems simple and affordable for Hawaii residents.

“Often, utility customers want to install solar, but the upfront installation cost is a challenge, and it’s not always easy for them to obtain financing through a traditional channel,” said Cyd Miyashiro of the Hawaii Green Infrastructure Authority. “We are thrilled to offer an easy, affordable way to get our customers the financing they need—and to work with EFS, a partner with a long history and strong track record in financing energy efficiency and renewable energy. The State of Hawaii is committed to renewable power and hopes this initiative will drive increased adoption amongst our residents.”

Loans through the GEMS Program are now available to finance up to 100 percent of the cost of solar electric systems (up to $75,000), with no down payment required. The Program partners with qualified installers to assist borrowers with the installation of solar photovoltaic equipment.

Fixed-rate loan terms are available for up to 20 years, and there are no closing costs or prepayment penalties associated with the loans. To be eligible, owner-occupied, single-family homes must be located in the State of Hawaii and within the Hawaiian Electric Companies’ (HECO) utility service territories.

Consumers can access the GEMS program loan application via EFS’ easy-to-use website, or by calling toll-free 800.600.7066. Most loans are approved within 24 hours, and repayment is simple—consumers can make monthly payments via automatic bank withdrawal. EFS handles every aspect of the GEMS Program loan, utilizing their expertise to help Hawaiian contractors and customers install solar electric systems.  

 

 

 



July 7, 2015


Topic Area: Press Release


Recent Posts

Hospital Evacuation Highlights Importance of Emergency Preparedness

Berger Hospital was evacuated after smoke was discovered in the basement.


Building a Culture of Infection Prevention

Investing in infection prevention can benefit healthcare organizations and patient outcomes.


Ground Broken on Sanford Health Fargo's Peltier Lodge

The 28,400-square-foot facility will feature spaces to support patients and loved ones during treatment and throughout their outpatient care and monitoring.


Arkansas Urology Associates Experiences Data Security Incident

The incident occurred in March.


The Role of Facilities Managers in Healthcare Design

Jiayin Li discusses the way in-house facilities teams can help shape the design of key spaces.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.